RA-21-0137, Duke Energy Carolinas, LLC - Emergency Plan Revision 2021-001 (2024)

Duke Energy Carolinas, LLC - Emergency Plan Revision 2021-001
ML21118A123
Person / Time
Site: Oconee
Issue date: 04/28/2021
From: Snider S
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RA-21-0137
Download: ML21118A123 (5)

vde

  • v
  • t
  • e

Similar Documents at Oconee

Category:Emergency Preparedness-Emergency Plan

[Table view]

Category:Letter type:RA

[Table view]

Contents

  • 1 Text
    • 1.1 Subject:
    • 1.2 SUMMARY
    • 1.3 SUMMARY
    • 1.4 SUMMARY
    • 1.5 SUMMARY

J'_., DUKE

~ ENERGY~ Steven M. Snider Vice President Oconee Nuclear Station Duke Energy ON01VP I 7800 Rochester Hwy Seneca, SC 29672 RA-21-0137 o 864.873.3478 f 864.873.4208 Steve.Snider@duke-energy.com April 28, 2021 10 CFR 50.54(q) 10 CFR 72.44(f)

Attn: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852-2746

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, and -287 Emergency Plan Revision 2021-001 Pursuant to 10 CFR 50.54(q) and 10 CFR 72.44(f), Duke Energy is submitting the attached summary of changes to the Oconee Nuclear Station (ONS) Emergency Plan. The effective date for the changes is March 31 , 2021 .

This revision has been evaluated in accordance with 10 CFR 50.54(q) and it was determined that the change did not reduce the effectiveness of the ONS Emergency Plan. The revised ONS Emergency Plan continues to meet the requirements of Appendix E to 10 CFR 50 and the planning standards of 10 CFR 50.47(b).

If there are any questions or concerns pertaining to this revision please call Sheila Dalton, Manager Nuclear Support Services, at 864-873-3657.

Sincerely, Steven M. Snider Site Vice President Oconee Nuclear Station Attachment ONS EPLAN CHANGE

SUMMARY

2021-00 1

RA-21-0137 April 28, 2021 Page2 cc: Ms. Laura Dudes Administrator, USNRC Region II Marquis One Tower 245 Peachtree Center. , NE Suite 1200 Atlanta GA 30303-1257 Ms. Andrea Kock Director, Division of Fuel Management Office of Nuclear Material Safety and Safeguards U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Shawn Williams Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Jared Nadel NRC Senior Resident Inspector Oconee Nuclear Station

ONS EPLAN CHANGE

SUMMARY

2021-001 Page 1 of 3

  1. E-Plan Current (Existing) Text Proposed (Change) Text Section B Reference 1 Footer Rev. 2020-001 Rev. 2021-001 January 2020 March 2021 2 8 .5.b.9 I} Cm-mJOOSi:lllllUiltl~I AddJ.llanal. Ops M21n,~ RP and Cbcuusny ptffllltle) rqGt tlJ tlrtt mocu.trd
8) ~ 1and CnftPtnoiaol:I AdddLomJ Ops, Mmdm:mc~ RP ;md Chrua.suy ~ 1 npcwt U> 1har mowttd Sllpn'\"ISOr m !hc: OSC~ Rnponst- acm,ncsun'MT lbnrcmJalfJob tasks supmuarm tbr.OSC. Rt:spcllse actm.tlcs mvoh"cdltlr"cuamtJobusla
  • hbop:demlbOSCTcammsp;llchzndcamol * ~mtbOSCTeamdlsp:althudcaimoJ
9) Gt--nrnhOD~l.-Clla!,gJ.,Q~

The ~ a n Supply Chm!. lwsoo apoct5 ID the osc Mauger Key B5 c f.ma:&m.l ~: i f & b J l (fQfl I

nspm51bw~ mdlxSe.

  • ~
  • t l c p ~ :md coordm2lr ~.iwstm:e:(kehmal,, cnft.

admimstWn:~ctc)

  • Anllgrtm'tqUapmctd2DdmpplytHOUIU5 Removed step "9 Generation Supply Chain
  • Pnpartforfaabty.r.ctn"Zbml(rooms \\ukart~eqwpoms ~)
  • P.1rtJop:ltt "'lib OSC' T~ dl~ch aad coutrol Liaison", added change bar
  • Sa\."e as pnnmy pomi of CODUct for SAFER and FLEX support B5c { 1.Dtrttoc:v~1onsf:KJl!!I~

3 8 .9 B9 LoolA~Sn~ B9 U&llAISDDSwwi Agn,cmmt5 v.'llh local agmcy support eroops, mi."" t>ttn made to asSlst lbc Ck.Ultt AgrtrlDtillS mtb local ap.-ncy ~ P"CJUPS ban bttn m:ade to assast 1hr Ocaoee

!',..'ntkarSlte4lf,ngcocrgmcysituallo!U Nuclear S i t e ~ emtrgcicy 5:IGlbCIOS POllCE- POLICE-Or:00tt Shcnff's~ Ocaatc Shtttfl's Dq:mtmal' Pdms Shmff's Dqmtment Plcum; Sbmffs I>qmtmm1 S131tofSoulbCarolm:I-S C H1gbw:.yP:atrol St1rtt of South earow -s c Higbw~y P.itrol S C Law Enfofttmrm Dnision S C lawEDfor<<mcmDn'lSIOD M m t.JI..A.NCE- A.1\IBUI..A..WE -

Ocm<< Mc nan2l Jbpta] - Emogmcy Mf'dlc:a1 Sm.~ OcalttMcotorul Hosptal - ~ Mtlbc::al Sm.ires MEDICAL- MEDICAL ,

0c-* - ~ . Prum, 11,oJQi Sy,,= I Oc:aatt Mmimu! Hospital - Praml Heal!h Sysiem b\".?0..'0-<<11

!.uiy2DJD I :L.* 202lAIOl I

Removed change bar from last line l~and I I I I: I I 4 Table B-1b I Genttntion S1JPOl~ Chain I..iai.sao. t ~ I I I I I I CmRtu,.~ Actions l!AE Ta:hnicimi ' ' = I I 2 I I Rqwr and Can-<< b<0 Actwm

- JAE Ttthmcilm (OSC)

M,cli;miail T<<hniam, (OSC) l ~leclwiica1 Tedmil:l.3D ( l r-.1 I I I I I Rad w- n.-., ,osr.

IRadWastc I I I I I Removed "Generation Supply Chain Liaison (OSC)", added change bar

,I l I 28 I 34 I 5 Table B-1b II :2 I 28 I 31 I I Changed "34" to "3 1", added change bar 6 Figure B-2 I ,..... I I ,. ... I OSC Mamger OSCM,n-l-f-1 I }f-i ....._ J

-~

l - Man.lger

~ ~ tOSC Log Keeper Au~osc

  • -* I l J I l ~- l ,-

I I o,,e,-.. J j l I l

GenenliOn Supply Chaialw,on p ..,,.lons RP I I Removed "Generation Supply Chain" block, added change bar

ONS EPLAN CHANGE

SUMMARY

2021-001 Page 2 of 3 E-Plan Current (Existing) Text Proposed (Change) Text Section H Reference 7 Footer Rev. 2020-001 Rev. 2021 -001 January 2020 March 2021 8 H.1.b H.1.b QmtioosS!J1J11Cenler{0SQfall!eH-2l H.1.b QmtiOlll Svpt Caiter (OSCXfigure H-2)

\n~SupportCenterhas beentlbblislrd in the Ojmtions Center An~SUWJ!!Centerhasbetne>1
lblishedintheOperatiOllSCenter locatedin the Unit 3CO!ll!ol Room Pmonnt1 as~gned to this 51JW011 crnter located in the Unit 3Control Room. Perioonel assigned to this support center liill iII1ude the following: Iiill inch1de the following:
  • Woii Control
  • Wc<<krontrol
  • Chemistty
  • Chemistry
  • Radiatioo Prot<<tion
  • Radiation Protection

-~

  • M:!intenance
  • Mainten.nce
  • Ojmtions
  • Ojm1iOllS
  • Engineering
  • GenerationSupp~Cbain
  • Security

' Security I Tot~Support Center has shielding and yentiJation to the same The QieratiO!ll Support Center has shielding and Yentilatioo to the 5ailf degree as the Control Room. Breathing~ aro protectiveclothing are degree as the Control Room Breathing equipment and 11ottctive clothing are availablein the~Support Caiter shouldanycraftsman1echnician be available in the ~Support Center should anycraftsmanledmician be required to petfomJ aflli: orfunc1ion in an area thatwooldrequire protectiYe required to~ aflli: or fulrtion in an area tll:I! would require 11otective clothing and bre:lthing apparatus.

do1l!ing and breathing apimafll1.

Removed "Generation Supply Chain",

added change bar 9 H.4 H.4 Acfuation ml Staffin~ oflhe fooeencvRtspse Ormnilation H.4 ActivationandS~ofthefmen!fficvRt,poose<lrmz'1tion Acti\,lli1111mls1affing of the EmergencyRt;ponse Orgamzation 11ill be in Activation and staffing ofthe Enrigenry Rtspmse Organization \\ill be in

,midance wrth the mrgm:y action lmls ml the irocedurel ~'tlqled for accordance liilh the =genry action levels ml the prmres deteloped for detemiining emo:geocy !l'5pOll5t. determining =gencyruixmse.

lfuision,Woo Directi.es describe the Emergenry Respoose OrganizaliO!l Division,S<<tion Direcfu*es dtsm'be the Emergency Respoosr Org;mizaliDll Figure A-2Adqrict; theproctml!efortecall of the EmergenryOrganintioo. I figure A-2A lipiru the11ocedure forrecaD of the Fmergenry Organi;Jtion Removed change bar 10 H.11 HJ I Idtn!ilication ofEmfrffllCV Kits H.11 Identificationofaw2encVKits Emgency kits are located in i'3ri0ll5 locations. See figures below 3JMl awgency kits are located in ilriws locatiOD.1. 54- fignl'S belowand procewrr for specilic locations. procedure for IJICcific locations.

Protectil'r EquiJllltlllKirs- figlm H-13, H-H, H-17 Protmrrr Equipment Kits-Figure. H-13. H-14, H-17 Cmnmmira1iOlllEquipnrm-FigurcsH-12, H-16 Cmmmmications Equipmenl -Figures H-U. H-16 Radio!~ MonitorillgEquipoo!-fignl'S H-12, H-16,H-17 Radiological Monitoring FJpiipmrnt -Figures H-12, H-16. H-17 fmgttcy Suw!ies- figure H-16, figure H-17 fmgeir:y Supplies- Figmes H-16, FigureH-17 Emt!gtJicy Medical Supplies- L1, 14 D<<omnation Suwlies-K-3 I fmergeir:y Medical Supplies- L1, L.4 IlttonlmtionSupplies-K-3 Spill Oe3Dllp Equij!lltlll Supplies -H-19 Spill Oeannp Equipmtn1 Sllpp!ies-H-19 Removed change bar

ONS EPLAN CHANGE

SUMMARY

2021-001 Page 3 of 3 11 Figure H-2 J. Generation Suoolv Chain I I.

IK-I I K. l L IL_ I M. I M. I N. Asst OSC Manager ( N_ J As.st OSC M an.1,r<!r

0. l o. l P. RP Shift Ip_ l RP Shift Q. I Q_ I R. IR. I Removed from J "Generation Supply Chain *: added change bar
RA-21-0137, Duke Energy Carolinas, LLC - Emergency Plan Revision 2021-001 (2024)
Top Articles
Latest Posts
Article information

Author: Otha Schamberger

Last Updated:

Views: 6397

Rating: 4.4 / 5 (55 voted)

Reviews: 86% of readers found this page helpful

Author information

Name: Otha Schamberger

Birthday: 1999-08-15

Address: Suite 490 606 Hammes Ferry, Carterhaven, IL 62290

Phone: +8557035444877

Job: Forward IT Agent

Hobby: Fishing, Flying, Jewelry making, Digital arts, Sand art, Parkour, tabletop games

Introduction: My name is Otha Schamberger, I am a vast, good, healthy, cheerful, energetic, gorgeous, magnificent person who loves writing and wants to share my knowledge and understanding with you.